Scroll
Consultancy
Curaçao
Vestas V117
5 wind turbines

Services

Wind Farm Tera Kora II

Wind farm Tera Kora I is operational since 2012 and consists of 5 Vestas V90 3.0MW turbines. In 2017 Topwind was involved in the extension of this wind farm. The extension (5 Vestas V117 3.3MW turbines) is initiated by NuCuraçao Windpark II, a consortium of NuCapital and Aspiravi. After the extension wind farm Tera Kora I & II have a total power of 31.5 MW.
Topwind has been assigned by NuCuraçao Windpark II B.V. to provide the Owner Engineer services. The scope for Topwind includes:

  • Inspection at the Vestas factory in Denmark before loading of the main components.
  • After shipping of the turbines Topwind was responsible for the quality and Take Over of the turbines and wind farm facilities like SCADA.
  • Monitoring and approval of the ‘trial operation’.
  • The Owner Engineering is finished with a Take Over inspection to ensure quality and delivery according to the contractual arrangements.
Want to know more?
Please contact Martin
mvdb@topwind.nl
+31 (0)342 745 462

Topwind during the past 25 years often acted in an Owner Engineer role to our clients in both local and international projects. Maintaining and validating ‘lessons learned’ allows us each time again to improve further. Combining theory and practice, like with the in-house knowledge of FIDIC contracts, enables our dual role of Owners Engineer and in parallel participating actively in all project aspects and phases.

Johan Top - Partner and Senior Consultant Topwind