The Krammer wind farm is the largest citizens initiative in the Netherlands. In the period from 2017 to 2019 34 Enercon E-115 turbines are built on the Krammersluizen locks. Topwind Site Engineers provided quality supervision during the construction (from loading and unloading of main components until the Take Over of the wind turbines). Click here to read an interview with Jasper Sedee about his work at Krammer.