Scroll

Project

Wind Farm Oostpolder

Waddenwind and Innogy realize a wind farm of 21 wind turbines with an installed capacity of approximately 100 megawatts (MW) in the Oostpolder. The planned wind farm consists of 21 wind turbines (hub-height maximum 166 meters and a maximum rotor diameter of 145 meters).

The Topwind team supports Waddenwind (12 turbines) and Gijzenberg (1 turbine) in the preparations for the realisation such as the tender for the wind turbines and the Balance of Plant. A preferred supplier has now been selected, and the construction of the roads is already finished.

Want to know more?
Please contact Peter
ps@topwind.nl
+31 (0)342 745 462